jumbo1.jpg

Interserve Construction Ltd. - Advocates Close

advocates-close

Brief:

Manufacture and install a new structural steel core to an existing Victorian Building.

Solution:

To produce detailed fabrication drawings and then devise an method to manually handle 140 tonnes of steelwork into the existing building and then erect the four storey structure without the use of any crane due to site limitations.

Status:

Delivered on budget and to time scale.